PILING

Bauer sets new standards for low-emissions

Hybrid rig operating in Friedrich-Krause-Ufer reduces emissions and fuel consumption

The innovative hybrid drive used on the eRG 19 T hybrid from RTG Rammtechnik combines the performance level of a 430kW diesel engine with an 88kW electric motor

The innovative hybrid drive used on the eRG 19 T hybrid from RTG Rammtechnik combines the performance level of a 430kW diesel engine with an 88kW electric motor | Credits: Bauer

Roaring engines, smoky exhausts and the smell of fumes and diesel – the image of a typical major construction site? Not so at Friedrich-Krause-Ufer in the German capital Berlin where Bauer Spezialtiefbau,...

Start a free trial to continue reading this article

Already have an account?

Subscribe now