PILING

Casagrande B240 XP-2 piling rig sets sail for Australia

Casagrande grows international market with shipment of a 240 XP-2 piling rig to Australia

 A brand new B240 XP-2 piling rig from Casagrande about to be shipped to Australia

A brand new B240 XP-2 piling rig from Casagrande about to be shipped to Australia

Incorporating cutting-edge technology, the B240 XP-2 stands as proof of Casagrande's unwavering commitment to delivering high-performance solutions for the dynamic needs of the construction and infrastructure sectors. It combines a powerful engine and an advanced hydraulic system that empowers the rig to tackle even the most challenging soil conditions, ensuring consistent and powerful performance on every job site.

What sets the B240 XP-2 apart is its inherent versatility: the rig is designed to accommodate an extensive range of drilling techniques, making it versatile for many piling applications. Whether it is a high-rise construction project or a foundational task in a remote location, the B240 XP-2 rises to the occasion.

Equipped with high technology, the rig introduces efficiency and precision in piling operations. Intelligent control systems, coupled with advanced safety features, not only enhance operational efficiency but also prioritise the well-being of operators and the environment.

As the B240 XP-2 makes its journey to Australia, it steps into a market that is witnessing unprecedented growth in construction and infrastructure development. The versatility and advanced features of this rig position it as a valuable asset for Australian projects.

The delivery of the B240 XP-2 to Australia is a demonstration of Casagrande's dedication to providing innovative solutions to meet the evolving needs of the global construction industry. As the rig embarks on this journey, it carries with it the legacy of Casagrande's excellence, poised to make a mark in the dynamic and growing Australian market.