Casagrande is contributing to the construction of a panoramic cycle path by Lake Garda in Malcesine, Italy.
The contractor on the job is using a Casagrande C6T XP-2 to drill the tunnel that will make this unique route possible, which is designed to enhance the area and offer an unforgettable cycling experience.
The machine is performing fore poling drillings with a nine-hole arch with 9m advancements.
With its combination of power, reliability, and flexibility, the C6T XP-2 is the perfect piece of equipment for this ambitious project on Lake Garda.