duty cycle crane

MINING

Bauer constructs cut-off wall elements in geothermally active ground

Bauer constructs cut-off wall elements in geothermally active ground for the first time

24 May 2021

PILING

ECA brings Bauer MC 96/Berminghammer to North America

Bauer's MC 96 duty-cycle crane paired with hanging Berminghammer lead assembly now an option at ECA

07 May 2021

PILING

First cutter jobsite in New Zealand for Bauer

The first use of a Bauer MC duty cycle crane and BC cutter system in New Zealand

12 August 2020

INFRASTRUCTURE

Bauer technology in use at Shenzhen-Zhongshan Bridge megaproject

Bauer technology is being used on a project that will see almost 4km of road built above water

01 October 2019

MINING

Bauer's 228m trench cutter world record

A record depth of 228m has been achieved by a Bauer trench cutter at a mine exploration project

21 June 2019

CONSTRUCTION & FOUNDATIONS

Bauer technology in use for Scandinavia's tallest building

Bauer equipment is being used to create the foundations of the tallest building in Scandinavia

30 October 2018

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.