GEOTHERMAL

Geothermal drilling progresses at MARK 51°7 in Germany

Early success with geothermal drilling project at a German technology business park

 At Germany’s MARK 51°7 the old tunnel of the former Dannenbaum colliery has been reached and is now being checked whether mine water can be pumped to the surface to create geothermal energy

At Germany’s MARK 51°7 the old tunnel of the former Dannenbaum colliery has been reached and is now being checked whether mine water can be pumped to the surface to create geothermal energy

At MARK 51°7 the old tunnel of the former Dannenbaum colliery has been reached and is now being checked whether mine water can be pumped to the surface from there as planned. At the same time, the second...

Start a free trial to continue reading this article

Already have an account?

Subscribe now