Trimble’s involvement with the construction of the Kidston Pumped Hydro Project in Australia
28 May 2024
Circulation test after stimulation proved fluid flow and energy transfer from an EGS reservoir
24 May 2024
Another offshore wind project in the Baltic Sea has been awarded to Van Oord
23 May 2024
Van Oord’s Aeolus has installed the first monopile foundation at the RWE Sofia offshore wind farm
21 May 2024
Cat's Schertz facility to add 25 positions to begin building new industrial engine
20 May 2024
Two larger pipe diameters added to MGS range of Thermo-Loops ground source heating pipes
17 May 2024
The latest, largest diameter monopiles will be capable of being handled by Van Oord's new Vessel
15 May 2024
Innovative new solar farm pile driver designed specifically for solar farm applications
09 May 2024
Drilling is the first step in an optimised mine value chain, so it is crucial to
Rigs, tooling designed for direct push propel profits, production across industries
Multi-application drill rigs and enhanced tools boost productivity and profits.