Rotterdam

PILING

Bauer's micro-pile solution for Rotterdam tunnel project

How 10,000t of GEWI material will be installed by Bauer as 4,500 individual piles in Rotterdam

04 February 2020

PILING

Van Oord gifts Waterwoud lookout point to City of Rotterdam

Van Oord has gifted a riverside lookout point to the people of the City of Rotterdam

07 November 2019

EUROPE

Royal designation for Van Oord

Specialist marine contractor Van Oord has been conferred the right to use royal designation

26 November 2018

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.