Paris

INFRASTRUCTURE

Webuild finishes excavation on Lot 2 of Line 16 of Grand Paris Express

Second Webuild TBM finishes bore for Paris Metro extension project

12 March 2024

INFRASTRUCTURE

Webuild and NGE's first breakthrough on Line 16 of Grand Paris Express

Celebrations have taken place to mark the first TBM breakthrough on Parisian metro extension

31 March 2022

GEOTHERMAL

Mapping near-surface geothermal potential in Paris

Options for the viability of ground source heating in Paris are being studied

01 March 2022

PILING

INTERMAT Paris 2021 cancelled

No INTERMAT in Paris in 2021 as event is cancelled and rescheduled for 2024

04 January 2021

PILING

Paris Construction Week

Construction show INTERMAT will take place as part of Paris Construction Week in 2021

17 September 2020

PILING

Trevi France working on 'Des Acrobates' for Grand Paris Express

Trevi France is using Soilmec rigs to build diaphragm walls for a Paris Metro development

17 June 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.