infrastructure: 30 of 33

INFRASTRUCTURE

How do you characterise ground conditions for underwater tunnels?

The challenges associated with characterising the ground conditions for underwater tunnels

28 February 2020

INFRASTRUCTURE

Students get first-hand career information from Herrenknecht engineers

Herrenknecht continues its support of Engineer's Day at Max Planck High School for 10th year

12 February 2020

SITE INVESTIGATION

Kaunas to Ramygala site investigation completed for Rail Baltica

Site investigations have been completed on a 78km long section of Rail Baltica new Lithuanian route

06 January 2020

PILING

MHWirth pile top drill rigs for Mumbai Trans Harbour Link

MHWirth pile top drill rigs are beign used in India on the Mumbai Trans Harbour Link project

25 November 2019

INFRASTRUCTURE

Mixed-in-place sealing wall for flood protection

Bauer is creating 28,000m² of MIP sealing wall for a project along the Rhine river in Germany

21 November 2019

INFRASTRUCTURE

Extending London's Overground

Piling under an existing bridge on a UK rail project saw Martello Piling using its bespoke rig

21 October 2019

VIEWPOINT

A year in drilling…

One man's reflections upon a turbulent year for drilling in the construction sector

14 October 2019

INFRASTRUCTURE

The Vasco Da Gama bridge project

Looking back at the piling work undertaken by Trevi Group for the Vasco da Gama bridge in Lisbon

08 October 2019

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.