barge

PILING

Installing 240ft drilled shafts with a barge-mounted Bauer drill rig

How to overcome the challenges of drilling deep, large diameter pile shafts from a barge on a river

03 June 2022

PILING

UK company completes pile-driving project in Jordan

A UK piling specialist has completed work in the South Port section of the New Port of Aqaba, Jordan

26 September 2019

AUSTRALASIA

Keller barges ahead with Australian marine projects

Austral Construction has added a A$6.5 million self-elevating modular platform to its fleet

22 June 2018

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.