PILING

Casagrande rigs used for building an eight lane expressway in Mumbai

As part of a project in India to build the Shirsad – Masvan section of the Vadodara Mumbai Expressway, Casagrande is drilling the piles to connect and build an eight lane access controlled expressway.

 B300 PX-2 and B250 XP-2 rigs from Casagrande are being used in India to install the piles for an eight lane access controlled expressway that will form a part of the Shirsad – Masvan section of the Vadodara Mumbai Expressway

B300 PX-2 and B250 XP-2 rigs from Casagrande are being used in India to install the piles for an eight lane access controlled expressway that will form a part of the Shirsad – Masvan section of the Vadodara Mumbai Expressway

The foundation work project consists of a total of 856 piles with diameters ranging from 1,200 to 1,500mm up to 25m depths. Of these piles, 520 are on land and the  remaining 336 are in water, all drilled...

Start a free trial to continue reading this article

Already have an account?

Subscribe now