PILING

Tackling challenging grouting projects in Singapore and Malaysia

Leveraging a global network of experts, Keller's ASEAN team innovates on grouting projects

 Keller staff 60m below ground in Singapore’s sewerage system using a new drilling procedure that enabled simultaneous installation of casing and drilling string to minimise potential disturbance of soft soil

Keller staff 60m below ground in Singapore’s sewerage system using a new drilling procedure that enabled simultaneous installation of casing and drilling string to minimise potential disturbance of soft soil

While grouting projects require highly technical expertise, Keller takes it a step further with an innovative problem-solving attitude as the company takes on challenging grouting projects in Singapore...

Start a free trial to continue reading this article

Already have an account?

Subscribe now