PILING

Royal BAM Group receives Hütte Bohrtechnik HBR 610 drill rig

BAM Infra Foundationworks takes delivery of new Hütte Bohrtechnik HBR 610 drill rig

This article is 4 years old. Images might not display.

The Hütte HBR 610 is a radio remote-controlled drilling rig, which offers front-the-wall kinematics and a drill mast of 20t pullback force. It is equipped with a double head drilling system that has a maximum torque M of 5,200daNm; the drilling diameter is 177.8mm/114.3mm, the casing and rod length 3m with a drilling depth of 70m.

The Royal BAM Group nv will use the Hütte HBR 610 first on its job site at the sluice Terneuzen in the Netherlands for anchor drilling with a double-head unit, jet grouting and screw piles / self-drilling anchors.

The new rig will then be deployed for several other projects like Levvel and Brunsbuttel.

With the new Hutte HBR 610, BAM Infra Foundationworks is ready for future challenges in the field of civil engineering.

Archived article: image not displayed.

BAM Infra Foundationworks' new Hütte Bohrtechnik HBR 610 anchor drilling with a double-head unit, jet grouting and screw piles / self-drilling anchors