INFRASTRUCTURE

Challenging drillings for underground lines

Electric HDD rig and mud pump allow Max Streicher to overcome difficult working conditions

 Max Streicher used its fully-electric driven horizontal drilling rig HDD45-E to overcome challenging conditions at a jobsite in Germany

Max Streicher used its fully-electric driven horizontal drilling rig HDD45-E to overcome challenging conditions at a jobsite in Germany

The drillings are located parallel to each other with a distance of 3.5m each and crossing under the river Isar. To increase the lateral distance, the drillings are carried out in different depths of 18.5...

Start a free trial to continue reading this article

Already have an account?

Subscribe now