INFRASTRUCTURE

Barhale to install critical north London sewer reinforcement

Barhale has been awarded a £4.5 million contract by Thames Water to install a protective liner to minimise the impact of a third party tunnel boring machine on north London’s important Middle Level Two (ML2) Sewer.

 As part of the preparation for tunnelling for the HS2 high-speed rail link, Barhale will reinforce a London sewer

As part of the preparation for tunnelling for the HS2 high-speed rail link, Barhale will reinforce a London sewer

The protection liner to the ML2, part of Joseph Bazalgette's transformative Victorian sewer system, will see civil engineering and infrastructure specialist Barhale install a 75m length of non-structural...

Start a free trial to continue reading this article

Already have an account?

Subscribe now