INFRASTRUCTURE

Socotec drives sensitive site forward with Skelair

Skelair provides Klemm solution to difficult drilling problem posed by Socotec

 A Klemm HBR Rod Handler supplied by Skelair International for a difficult job being undertaken Socotec

A Klemm HBR Rod Handler supplied by Skelair International for a difficult job being undertaken Socotec

With infrastructure works taking place adjacent to a 12m high Victorian retaining wall, the stability of the ground had to be verified. As working at height was significantly restricted and manual handling...

Start a free trial to continue reading this article

Already have an account?

Subscribe now