GROUND CONTROL

Beachfront stabilisation project for CAN Geotechnical

CAN's alternative solution delivers results for seaside landslide rebuild

 CAN Geotechnical is set to stabilise part of the historic Clock Café Chalet beachfront area in Scarborough after winning the contract with its own bespoke, tailor-made design

CAN Geotechnical is set to stabilise part of the historic Clock Café Chalet beachfront area in Scarborough after winning the contract with its own bespoke, tailor-made design

The landmark Clock Café Beach Chalets were damaged in a fire in 2013 and further impacted when the failure of the retaining wall saw it collapse against the historic, Grade 2 listed beach huts. The area...

Start a free trial to continue reading this article

Already have an account?

Subscribe now