The project, will have a capacity of 8.2MWe (four loops and a single ORC generator) when it reaches its full capacity. The assumed date of initial power production is 2024 and will be ramped up into 2026...
Already have an account? Sign in here
The definitive guide to drilling operations and excellence.
GeoDrilling International is the industry's only comprehensive source of breaking news on a daily basis for project and site managers, equipment producers, consultants and contractors.