Stage-V

MINING

The new generation PowerROC T35 is impressing in China

Latest PowerROC rig impresses users during trials at a Chinese limestone quarry

12 November 2024

INFRASTRUCTURE

New DX235RTF-7 tunnelling excavator from Develon

New crawler excavator designed especially for use in limited space tunnelling applications

26 July 2024

SITE INVESTIGATION

Casagrande launches C3S XP-2

Latest rig from Casagrande is a hydraulic crawler drill for geotechnical investigation

14 May 2024

INFRASTRUCTURE

Bobcat excavator gets remote control for shaft work in Sweden

Bobcat E88 8.9t mini-excavator specially modified for work on a tunnelling project in Sweden

27 March 2024

INFRASTRUCTURE

American Augers' DD600 maximises productivity

The new DD600 features an engine strategically selected to meet evolving jobsite requirements

31 October 2023

PILING

CZM introduces the CR25 to offer micropiling option

The first in CZM Foundation Equipment's line of micropiling rigs is the new CR25

25 July 2023

PILING

The latest Comacchio rigs complete the company's CH range

The latest Comacchio drilling rigs increase versatility of the company's range of piling options

21 December 2022

MINING

Caterpillar extends lineup of EU Stage V mobile power solutions

Caterpillar generator range now includes a 310kVA EU Stage V compatible option

08 April 2022

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.