PILING

Bauer constructs piles for major project in Saudi Arabia

Piling for a bridge project in Saudi Arabia sees Bauer operating a rig from a floating crane barge

 A Bauer BG 28 drilling rig was placed on a barge to carry out the drilling work for the ‘Red Sea Islands Project’

A Bauer BG 28 drilling rig was placed on a barge to carry out the drilling work for the ‘Red Sea Islands Project’

To create the area an archipelago off the coast of Saudi Arabia is being developed for sustainable tourism in this region. By 2030, a total of 28,000m² of beach, desert, mountains and volcanic areas on...

Start a free trial to continue reading this article

Already have an account?

Subscribe now