INFRASTRUCTURE

Terratec EPBM to build Klong Saen Saeb drainage tunnel in Thailand

A new Terratec TBM will take part in the Klong Saen Saeb drainage tunnel project in Thailand

A new 4.27m diameter Terratec EPBM destined for the Klong Saen Saeb Drainage tunnel project in Thailand has passed factory acceptance tests. Credit: Terratec

A new 4.27m diameter Terratec EPBM destined for the Klong Saen Saeb Drainage tunnel project in Thailand has passed factory acceptance tests. Credit: Terratec

Terratec has completed the factory acceptance tests of a new 4.27m diameter EPBM (earth pressure balance tunnel boring machine) destined for the Klong Saen Saeb Drainage tunnel project in Thailand. The...

Start a free trial to continue reading this article

Already have an account?

Subscribe now