INFRASTRUCTURE

Crossing the Main-Danube-Canal with Tracto trenchless HDD-technology

Getting utilities across a canal without disturbing shipping is a job for Tracto's HDD technology

 The GRUNDODRILL28Nplus, the drill rod changing magazine and the drilling mud pond next to the Main-Danube Canal

The GRUNDODRILL28Nplus, the drill rod changing magazine and the drilling mud pond next to the Main-Danube Canal

The Main-Danube-Canal (MDC) runs over a length of 171km in Bavaria and connects the Main and Danube rivers from Bamberg to Fürth and Nuremberg to Kelheim. With its small but beautiful harbour, the town...

Start a free trial to continue reading this article

Already have an account?

Subscribe now