INFRASTRUCTURE

Barhale's simultaneous pipejacks from a single shaft

An innovative project is underway in London with two pipejacks being simultaneously launched

 In a pioneering move, Barhale is carrying out a set of simultaneous pipejacks from a single shaft at the North London Heat & Power Project in Edmonton in the UK

In a pioneering move, Barhale is carrying out a set of simultaneous pipejacks from a single shaft at the North London Heat & Power Project in Edmonton in the UK

Two Iseki 1200 tunnel boring machines (TBM), named after two deities - the Norse goddess Freya and the Greek goddess Artemis, are carrying out two pipejacks of 122m and 210m to install two new 1,200mm...

Start a free trial to continue reading this article

Already have an account?

Subscribe now