Neidhardt Grundbau GmbH

 Neidhardt Grundbau installed the tie backs on two sections of a sea wall using a Klemm KR 805-3G rig
PILING

Drilling at the beach with Klemm

A Klemm piling rig is being used to reinforce coastal defences at a German island

04 April 2022

PARTNER CONTENT

Geothermal Game Changer

Customer-inspired engineering leads to fieldwork simplified

PARTNER CONTENT

A Sneak Peek at the Future of Drilling Data

Drilling is the first step in an optimised mine value chain, so it is crucial to

PARTNER CONTENT

Gain Ground on the Competition

Rigs, tooling designed for direct push propel profits, production across industries

PARTNER CONTENT

Simplify your geotechnical Jobs

Multi-application drill rigs and enhanced tools boost productivity and profits.